| 1 |
Da Nang-Quang Ngai Highway Project - Independent Consultant |
CPCS Consultant (Canada) |
| 2 |
Dau Day-Phan thiet Highway Project - Independent Consultant |
World Bank |
| 3 |
Investigation and preparation of economical and technical report of work construction: maintenance of road surface for 2-9 street project |
Da Nang Rural Transportation Management Unit |
| 4 |
Preparation of economical and technical report of work construction : treatment for landslide due to typhoon No.9 at road project No. DT604 in Hoa Vang District, Da nang City |
Da Nang Rural Transportation Management Unit |
| 5 |
Appraisal for the technical design: Nguyen Tri Phuong - Hoa Quy route - Item of work: Nguyen Tri Phuong Bridge |
Da Nang priority infrastructure Investment Project Management Unit |
| 6 |
Appraisal of the technical design: Nguyen Tri Phuong-Hoa Quy route - Item of work: Khue Dong bridge |
Da Nang priority infrastructure Investment Project Management Unit |
| 7 |
Topography survey, Design of working drawing for project: upgradation for transportation network in the Central of Viet Nam, Dak Nong province, Package No. DN02 (Km34+600-Km39+500) |
Phuong Nam Joint Stock Co., |
| 8 |
Appraisal of working drawing design; Da Nang priority infrastructure investment project: Dredging, reinforcing Phu Loc canal and its side road |
Da Nang priority infrastructure Investment Project Management Unit |
| 9 |
Appraisal of the working drawing design – Cost Estimation for items: Road surface, pavement, drainage system - Tran Hung Dao extended Street |
Municipal Engineering and Public Transportation Project Management Unit |